How can I get building permit in Kerala?

How can I get building permit in Kerala?

Obtain a Building Permit Application. The Building Permit application is made by submitting the Elevation, Floor Plan, and Section drawings to the local self-governing body along with the Land Tax Receipt, Copy of the Original Deed, and Sanction Drawing to the Municipality/Building Corporation’s Department.

How long does it take to get building permit in Kerala?

As per the new scheme, five working days after the submission of the joint plan and self-attested certificate by the building owner and engineer, the local body secretary would issue a receipt which would be considered as “deemed permit”.

What are the requirements on filing a building permit?

New Applicant

  • Barangay Clearance.
  • DTI/SEC Registration.
  • SSS Clearance.
  • Homeowner’s Clearance for Business (if operating in subdivision)
  • Locational Clearance (if required)
  • Fire Clearance (if required)
  • Building Permit (if required)
  • Certificate of Occupancy (if required)

Is building permit required for renovation?

Do you need a building permit? Spoiler: you probably do, unless you’re only doing cosmetic interior upgrades, like painting or updating your kitchen faucet.

What is the penalty for building without a permit in Kerala?

The fine will be Rs 2 lakhs for buildings having a plinth area up to 100 sq m for violations, Rs 4 lakhs for buildings having a plinth area up to 200 sq m area, and Rs 6 lakhs for buildings up to 300 sq m area.

Who are exempted in applying building permits?

Exempted from the payment of building permit fees are: (1) public buildings and (2) traditional indigenous family dwellings….

  • Character of occupancy or use of building.
  • Cost of construction “ 10,000/sq.m (A,B,C,D,E,G,H,I), 8,000 (F), 6,000 (J)
  • Floor area.
  • Height.