One of the fundamental tools for managing change is the Pre-Startup Safety Review (PSSR). A PSSR consists of a checklist of items to be thoroughly verified before a process begins or restarts in order to ensure that potential hazards have been properly addressed.

What is the importance of Pssr?

The PSSR is a safety review conducted prior to startup (commissioning) of a new or modified processing/manufacturing plant or facility to ensure that installations meet the original design or operating intent, to catch and re-assess any potential hazard due to changes during the detailed engineering and construction …

What is Pssr in oil and gas?

A systematic and thorough check of a process prior to the introduction of a highly hazardous chemical to a process.

What is a Pssr inspection?

(PSSR) Checklist. A PSSR inspection allows you to thoroughly review the status of employee training, construction, equipment, and other components involved in a company change. This PSSR checklist will help ensure that your employees are kept safe during Management of Change (MOC).

When should a Pssr be done?

2.0 Scope: The PSSR is completed prior starting up new covered process areas and for modifications to existing covered process areas that are significant enough to require a change in the Process Safety Information (PSI).

What is Pssr in STCW?

Features of the course Personal Safety And Social Responsibility(PSSR) course is one of the four basic familiarization course, which a prospective seafarer must do before proceeding to the sea.

What is a PSSR checklist?

A pre-startup safety review (pssr) checklist is a tool used by a pssr team during a safety review of a new or modified manufacturing facility before commissioning. this checklist helps ensure that a facility will be safe for employees and that equipment will operate according to design specifications.

What Pssr covers?

The Pressure Systems Safety Regulations 2000 (PSSR) cover the safe design and use of pressure systems. The aim of PSSR is to prevent serious injury from the hazard of stored energy (pressure) as a result of the failure of a pressure system or one of its component parts.

Which circumstance would require a pre start health and safety review PSSR )?

Section 7 of Regulation 851 requires that a pre-start health and safety review be carried out in factories on certain machinery, protective elements, structures, and processes that can pose a serious hazard to worker health and safety, before they are operated for the first time or before modifications are made.

Who is responsible for performing pre start up evaluation?

1. The employer shall perform a pre-startup safety review for new facilities and for modified facilities when the modification is significant enough to require a change in the process safety information.

What is Pssr in ship?

This STCW course on Personal Safety & Social Responsibilities (PSSR) focuses on the safe working procedures on a Ro-Ro passenger ship, including safe loading and unloading of the vessel, cargo securing, the safe carriage of dangerous goods and how to operate hull openings, such as bow and stern doors and ramps.

Does STCW Pssr expire?

NaviClass STCW PSSR Personal Safety and Social Responsibilities certificates are recognized by the Federal Public Service Mobility. Certificates are valid for five years. These certificates are recognized by all IMO countries.