Is a method statement a legal document?
Table of Contents
Is a method statement a legal document?
No, not really. Although method statements don’t have a section in the regulations and are not necessarily required for every work activity, they can help you to comply with the law. Method statements can be used to plan, instruct and inform. All requirements of health and safety law.
What is the meaning of method statement?
Method statements are documents that detail exactly how to carry out work safely. When it comes to ensuring building site health and safety, method statements are key. The purpose of method statements is to describe the safety precautions to put in place to control risks identified in the risk assessment.

How do you write a good method statement?
Your method statement should include a few important items, such as:
- The project.
- The activity.
- Date of assessment.
- Assessor.
- Responsibilities.
- Hazards (or reference to relevant risk assessment)
- Work procedure and control measures. Sequence of work. Access provisions. Security and safety of others. Techniques.
- PPE requirements.
What is the difference between a risk assessment and a safe work method statement?
Risk assessments are an assessment of risk, they tell you what controls are needed. A method statement will detail in what order those control measures will be used, and how to carry out the work safely. You can see what these documents look like, and create one for yourself.

How do you create a hazard identification risk assessment?
How to Conduct a Hazard Identification and Risk Assessment
- Step 1: Preparation. Before you even begin, put together a risk assessment team to conduct surveys and gather relevant information.
- Step 2: Hazard Identification. Identify hazards or potential incidents.
- Step 3: Risk Assessment.
- Step 4: Plan Control Measures.
- Step 5: Record Keeping.
- Step 6: Implementation and Review.
What is high risk work?
High risk work is any work that is in the scope of a high risk licence (based on the national standard) and includes: • Scaffolding work. • Dogging and rigging. • Crane and hoist operation (concrete placing booms have been added to meet cross border.
What does JSEA mean?
5. Definitions. Job Safety Environmental. Analysis (JSEA) Means the process used to break a task into steps; identify the potential hazards and control measures; and implement these so that the task can be completed safely.
Why is a Swms required?
The primary purpose of a SWMS is to assist supervisors and workers to develop, implement and monitor control measures for the construction work to be undertaken safely.
Is risk a assessment?
What is a risk assessment? Risk assessment is a term used to describe the overall process or method where you: Identify hazards and risk factors that have the potential to cause harm (hazard identification). Analyze and evaluate the risk associated with that hazard (risk analysis, and risk evaluation).
Which is the example of a hazard identification system?
Commonly used identification systems that help in recognizing potential chemical hazards are NFPA (National Fire Protection Association) signage and DOT (Department of Transportation) package labels.
Is a JSA a legal document?
JSAs are quasi-legal documents, and are often used in incident investigations, contractual disputes, and court cases.
What 4 components must the Swms include?
What needs to be included in a SWMS?
- The details of the construction work that is considered high risk.
- The health and safety hazards relating to the work.
- The control measures that need to be implemented to minimise or remove the risks.
- How the control measures will be actioned?
- When will they be monitored and reviewed?
Who should write a method statement?
It is a legal requirement for any business with five or more employees to have a written risk assessment and method statement before carrying out any work.
Is Swms same as JSA?
To summarise the difference between a JSA and SWMS, a SWMS is specific to the construction industry and is required for all high-risk construction work while a JSA is a one or two page form which outlines the hazards associated with a particular job or task.
How do I write a JSA?
A breakdown of the 4 steps of a Job Safety Analysis (JSA)
- Choose a job to analyze. At some point you would ideally do a JSA for every job performed in your workplace.
- Break the job down into specific tasks.
- Determine hazards and risk present in each task.
- Identify preventative controls and residual risk.
What is a JSA document?
A JSA is a form of risk assessment, which details step-by-step how a task is to be carried out safely. Sometimes the JSA is called a JSEA and includes environmental aspects as well. Control Measures – Step-by-step instruction on how to safely carry out the task by controlling each identified hazard.
What is a method statement in an essay?
A method statement is a description of how the work will be carried out safely. These documents are usually used for higher risk work, to provide information to employees about how the work should be done, and the precautions needed.
What is a method statement HSE?
The method statement describes in a logical sequence exactly how a job is to be carried out in a way that secures health and safety and includes all the control measures. The most effective method statements often include diagrams to make it clear how work should be carried out.
How often do Swms need to be reviewed?
Keep a copy available for inspection and readily accessible to workers until the work is completed, or for at least two years if there is a notifiable incident. The SWMS must be reviewed and, if necessary, revised when control measures are changed after a notifiable incident.
How do I get Swms?
Safe Work Method Statement (SWMS) Template
- List tasks involved and risk associated with each task.
- Take photo of the high-risk activity identified.
- Add comments and recommendations.
- Set and assign corrective measures through Actions; and.
- Complete the report by providing a digital signature.
What is a risk method statement?
A method statement is a clear explanation of how you are going to manage risks identified during the risk assessment. A method statement is an addition to the risk assessment, to help your planning and ensure that there are enough resources to carry out the task safely.
What is a safe work method statement?
A SWMS is a document that sets out the high risk construction work activities to be carried out at a workplace, the hazards arising from these activities and the measures to be put in place to control the risks.
What does JSA stand for in safety?
job safety analysis
How can you identify a hazard?
To be sure that all hazards are found:
- Look at all aspects of the work and include non-routine activities such as maintenance, repair, or cleaning.
- Look at the physical work environment, equipment, materials, products, etc.
- Include how the tasks are done.
- Look at injury and incident records.
What is a method statement example?
For example, on an electrical installation, instead of writing “Run cable from distribution board to first light.” a good method statement could read “Run 1.5mm² single core cables through existing metal 40mm² X 40mm² trunking from distribution board using a tower scaffold for access.
What JSA need to know before conducting the job?
According to OSHA, a JSA must focus on the relationship between the worker, the task, the tools, and the work environment….To do this, consider the following:
- What could go wrong?
- How could it happen?
- What are other contributing factors?
- What are the consequences?
- How likely is it that the hazard will occur?
Who can write a safe work method statement?
The person responsible for carrying out the high risk construction work is best placed to prepare the SWMS in consultation with workers who will be directly engaged in the work. Generally this means a SWMS is prepared by the builder for their workers, or by the subcontractor for their workers and themselves.